Estadio Presidente Perón: Difference between revisions

Content deleted Content added
RDPFLAME (talk | contribs)
No edit summary
No edit summary
 
Line 48:
 
In 2008, the stadium was remodeled, with the inclusion of modern broadcasting booths and VIP boxes. In May 2022, it was announced that the entire lighting system would be replaced by [[light-emitting diode|LED]] devices at an estimated cost of [[Argentine Peso|AR$]]44 million, and a [[Wi-Fi]] system will be installed to provide Internet service.<ref>[https://www.institutoacc.com.ar/index.php/instituto-tendra-el-primer-estadio-inteligente-de-cordoba/ INSTITUTO TENDRÁ EL PRIMER ESTADIO INTELIGENTE DE CÓRDOBA] at Instituto ACC, 24 May 2022</ref>
 
==References==